Phase 1: Prepare existing conditions and site analysis
-
Measure entire building to draw existing conditions (As-built).
-
Site Analysis
-
Obtain information of the existing structure/mechanical/plumbing/electrical.
-
Obtain exterior facade information including material specifications
Phase 2: SD- Schematic Design
-
Implementation of the owners program for proposed work.
-
Working schemes for the building
Phase 3: DD- Design Development (pricing set)
-
Prepare sketches for contract documents
-
Material Selections
-
Final plan and exterior elevations sign-off
-
Contractor selection- Bid analysis.
Phase 4: CD- Contract Documents/permit drawings
-
Prepare drawings for permit and construction
-
Coordination of architectural, engineering, and other consultant drawings.
-
Coordination of electrical/mechanical/plumbing drawings
-
All necessary drawing requirements for permit/Change of Occupancy/Construction